Major traffic disruptions in Munich: Prinzregentenstrasse closed!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Closure of Prinzregentenstrasse in Altstadt-Lehel due to tunnel maintenance work from October 7th. until October 8th, 2025. Expected risk of traffic jams.

Sperrung der Prinzregentenstraße in Altstadt-Lehel wegen Tunnelwartungsarbeiten von 07.10. bis 08.10.2025. Erwartete Staugefahr.
Closure of Prinzregentenstrasse in Altstadt-Lehel due to tunnel maintenance work from October 7th. until October 8th, 2025. Expected risk of traffic jams.

Major traffic disruptions in Munich: Prinzregentenstrasse closed!

In the Bavarian capital Munich, drivers have to adapt to changing traffic conditions. There will be a closure on Prinzregentenstrasse today, October 7, 2025, from 10:00 p.m. until 5:00 a.m. tomorrow morning. The reason for this is important tunnel maintenance work, which is essential for safety and the smooth flow of traffic. Two tunnels are affected: the tunnel between the Altstadtring and the Altstadtring with a length of 570 meters and a tunnel towards the Altstadtring, which extends to 573 meters. This measure not only affects traffic in the Altstadt-Lehel (zip code 80538), but also in Maxvorstadt (zip code 80333). Like [news.de](https://www.news.de/auto/859018921/verkehrsmelde-muenchen-zur-verkehrsstoerung-wegen-baustelle-sperrung-einschraenkung-von-0 7-10-2025-to-08-10-2025-restrictions-in-traffic-danger-of-congestion-in-munich-zip-code-80538-old-town-lehel-1-6-on-prinzregentenstrasse/1/) reported, higher traffic volumes and possible congestion are to be expected during this time.

As the city of Munich announces on its website, the closure is just one of many current traffic restrictions in the city. The construction work for the tram west tangent at the intersection of Fürstenrieder Straße and Agnes-Bernauer-Straße has reached a new construction phase. These construction measures are expected to last until Friday, December 19, 2025 and will affect not only private motorized transport, but also local transport relations. The crossing of Fürstenrieder Straße in the area of ​​Agnes-Bernauer-Straße is currently completely closed to cars.

Current construction work and traffic measures

The western Agnes-Bernauer-Straße will have a one-way regulation in the east direction until mid-September 2025, which means that there will no longer be any left-turn traffic at the intersection of Fürstenrieder Straße and Agnes-Bernauer-Straße. It will also no longer be possible to turn right from the north onto Agnes-Bernauer-Straße. Drivers have to re-plan their routes using the surrounding road network, such as Landsberger Straße, to avoid unpleasant delays. However, from mid-September, two-way traffic will be possible again on western Agnes-Bernauer-Straße. Further changes are also underway: The eastern Agnes-Bernauer-Straße between Fröbelplatz and Fürstenrieder Straße has been closed in the west since August 27, 2025, until the middle of next December.

The city is making every effort to allow pedestrians and cyclists to continue to use all transport routes, even if they are sometimes staggered locally so as not to endanger the mobility of all road users. Tram line 19 will also be replaced by a replacement rail service during the construction period until December 19, 2025, which will result in further changes to operations. According to the city administration, pedestrians and cyclists can continue to pass through Agnes-Bernauer-Straße while motorized traffic is redirected.

In order to stay informed about current developments, it is advisable to regularly follow the official information from the city of Munich. The construction site and traffic information also provides a good overview of ongoing construction projects and any restrictions. So stay on the lookout and plan your trips in Munich well – the construction sites cause a few surprises!