Traffic chaos in Puchheim: B2 closure ensures traffic jams to Germering!

Am 26. Juni 2025 ist die B 2 zwischen Puchheim-Ort und A 99 gesperrt. Umleitungen über Gröbenzell und Lochhausen empfohlen.
On June 26, 2025, the B 2 between Puchheim-location and A 99 was closed. Readings via Gröbenzell and Lochhausen recommended. (Symbolbild/MM)

Traffic chaos in Puchheim: B2 closure ensures traffic jams to Germering!

The federal road 2 (B2) between Puchheim-Ort and the connection to the A 99 has been completely blocked since Monday morning, June 23, 2025. This reports Merkur . The closure takes place as part of an urgently needed renovation of the section of the route, which was launched due to considerable road damage. The construction work is expected to be planned by July 13, 2025 and aim to completely renew the existing road surface.

Already on Monday morning there were severe traffic disorders. The Augsburger Straße in Puchheim-Ort and the streets in Germering were in traffic jams, while many drivers tried to use shorter routes instead of following the official diversion route via Gröbenzell and Lochhausen. The competent authorities ask the road users to follow the signposted detours and pay attention to the instructions of the traffic routing to avoid further delays, as well as germering emphasized.

resentment about traffic jams and signage

The reactions of drivers in social networks show a picture of the dismissal about the extended travel times and the inadequate signage. Some also report on parked cars that also hinder traffic. In order to offer real relief for the commuters, the use of the official diversion is still pointed out.

In addition to the B2 closure, there will be another temporary restriction in Fürstenfeldbruck. From July 8th to July 10th, Münchner Straße will be narrowed at Emmeringer Strasse for two days. During this time, access to blocked Emmeringer Straße will also only be possible via Emmering. Here, too, the authorities endeavor to run traffic at the construction site as smoothly as possible.

further transport adjustments

For all those who travel above the regional public transport, the aggregate of additional holding and journeys on line RE70 and the S8 on June 27 are pending special services, which concerns the journey to the event "50 Years DVAG". These information can be found in the RMV timetable information and the attached PDF files, as on hessenschau.de In view of the ongoing work and the detours, the local authorities would like to ask the citizens to show patience and to adapt to the changed traffic situations. Ultimately, the renovation of the B2 not only serves to improve road quality, but also to the security of all road users.

Details
OrtLochhausen, Deutschland
Quellen