Traffic jams and construction sites: This is how traffic works on the A96 today!
On June 4th, 2025 there will be traffic delays on the A96 near Aubing due to construction sites. Drivers should exercise caution.

Traffic jams and construction sites: This is how traffic works on the A96 today!
Today, June 4, 2025, significant traffic disruptions are expected on the A96 near Munich. The reason for this is construction sites and road construction work that extend over a section of 499 meters. The work began at 8:37 a.m. and is expected to last until 2:00 p.m. Drivers must be prepared for slow traffic and temporary traffic jams during this period, especially in the area of the Munich-South-West triangle (4), where the construction site is located. In order to reach your destination safely, it is advisable to drive at appropriate speeds and adhere to traffic signs, such as [news.de](https://www.news.de/auto/858670597/verkehrsmelde-muenchen-zur-verkehrsstoerung-wegen-baustelle-sperrung-einschrae nkung-on-04-06-2025-restrictions-in-traffic-congestion-risk-in-munich-zip-code-81249-aubing-lochhausen-langwied-freiham-auf-a96/1/) reported.
There had previously been reports of slow traffic on the A96, which leads from Lindau to Munich. Between Martinsberg and Wörthsee the average speed is around 58 km/h, while between Wörthsee and Martinsberg it even drops to 44 km/h, which results in a travel time loss of one minute. Things also remain slow between Gilching and Oberpfaffenhofen, as vehicles can only move at 44 km/h. The situation is similar towards Munich. Speeds of just 29 km/h are measured here between Etterschlag, as stau-check.de shows.
Current construction sites on the A96
The construction sites are not just limited to the area near Munich. In the Neuravensburg to Weißensberg section, work also takes place from 7 a.m. to 7 p.m., although the section is 0.3 km long. Work will also continue on a 6.5 km long route between Kißlegg and Leutkirch-Süd until around 3:30 p.m. The construction sites on the A96 cover several sections that are several kilometers long. Drivers should also be prepared for construction sites near Aichstetten and Mindelheim, which extend over a longer period of time and can accordingly influence the traffic situation.
Charging stations for electric vehicles
For those who rely on electric cars, there are several charging stations along the A96, ideal for a quick charge on the go. At the Lechwiesen Süd service area in Landsberg am Lech, for example, there are charging points with different capacities. These are available for both AC and DC charging, which is very convenient for travelers. You should keep these options in mind, especially on longer journeys.
Overall, a lot of patience is required today because the traffic conditions around Munich are not easy due to the construction sites. Anyone planning to use the A96 should definitely inform themselves beforehand and, if necessary, consider an alternative route.