Traffic chaos on the A95: Construction site ensures massive traffic jams in Munich!

Baustellen und Verkehrsbehinderungen auf der A95 in Thalkirchen vom 30.06. bis 01.07.2025 – wichtige Infos zur Verkehrslage.
Construction sites and traffic disruptions on the A95 in Thalkirchen from June 30th. until 01.07.2025 - important information about the traffic situation. (Symbolbild/MM)

Traffic chaos on the A95: Construction site ensures massive traffic jams in Munich!

Thalkirchen, Deutschland - this day, June 30, 2025, there is a lively traffic volume in Munich, and caution is required. On the A95, which leads from the Bavarian capital towards Garmisch-Partenkirchen, there are considerable traffic disruptions due to construction sites. How News.de reports, the restrictions should continue until July 1, 2025, 5:00 a.m. The narrowing of the road concerns the left and medium lanes over a distance of 8.6 kilometers, which leads to increased traffic volume and a risk of temporary traffic jams.

A traffic jam between Munich-Fürstenried and Starnberg was already reported this afternoon, which extends to a length of 3.7 kilometers and is accompanied by a time loss of about 16 minutes, as the live updates on the page

Details on the construction site

The construction site on the A95 between Munich-Fürstenried and the Starnberg triangle is part of extensive conservation measures that are necessary to keep the road network in good condition, according to the information from StMB Bavaria . Such measures are important in order to adapt the existing infrastructure to increased traffic demand. In Bavaria, modern job management is also used to keep the impairments through construction sites as low as possible.

For road users, this means that they have to expect restrictions on the coming nights. The construction work is designed to improve the safety and quality of the streets. But the traffic situation in the area remains tense for the next few days, especially in the period from 7:00 p.m. today until 5:00 a.m.

other current restrictions

  • traffic jam on the A95 between Munich-Fürstenried and Starnberg with 16 minutes loss (updated at 6:57 p.m.).
  • construction site between Sindelsdorf and Eschenlohe, which also causes disorders in traffic.
  • Maximum speed limits from 60 km/h to 80 km/h depending on the section.
  • Current reports indicate several construction sites on the A95 that will continue until December 2025.

Road users should find out more about current traffic management and construction sites on the important traffic routes and, if necessary, consider alternative routes. If you are dependent on the A95, you should expect additional time loss and plan accordingly.

Details
OrtThalkirchen, Deutschland
Quellen