Bahn chaos in Bavaria: Significant delays from construction work!

Wichtige Informationen zu Bauarbeiten in Johanneskirchen: Ab dem 07.06.2025 ändern sich Fahrpläne und es gibt Ersatzverkehr.
Important information on construction work in Johanneskirchen: From June 7th, 2025, timetables change and there is replacement traffic. (Symbolbild/MM)

Bahn chaos in Bavaria: Significant delays from construction work!

Johanneskirchen, Deutschland - The construction work on the German railway line in Bavaria has started. From today, June 7, 2025, until June 13, 2025, there are some changes to rail traffic due to extensive construction measures. [news.de reports that …] (Https://www.news.de/reisen-und-leben/858681043/deutschebahn-news-fuer-Bayern-Bava-Information-zur-line Trecke-AM-AM-7-6-05-00 o'clock throughout-BIS-FR-1-6-04-00 o'clock info-Ueber-Aktuelle-DB reporting-IM timetable/1/)

The changes concern the S-Bahn lines between Pasing and Ostbahnhof as well as the connections to Giesing, Riem, Trudering and Johanneskirchen. Travelers should prepare for replacement traffic by bus between the Isartor and Ostbahnhof as well as between Ostbahnhof and Riem/Trudering/Johanneskirchen.

important timetable changes

These are the specific changes for the S-Bahn lines:

  • s 1: trains start and end at the main train station (track 27-35), do not stop at the Hacker Bridge.
  • s 2: trains towards Petershausen/Altomünster ends on the Isartor, towards Erding at the Ostbahnhof (Gleis 6-14), without stopping in Riem.
  • s 3: trains in the direction of Mammendorf start and end on the Isartor, while the trains drive towards Giesing.
  • s 4: trains to Geltendorf end at Heimeranplatz (track 11), while the trains to Trudering between Pasing and Trudering fail.
  • s 5: trains begin towards Kreuzstraße and end in Giesing; All connections after Pasing are also out.
  • s 6: trains to Tutzing end in Pasing, while the trains to Ebersberg end in Trudering, with replacement traffic between Trudering (hair) and Ostbahnhof.
  • s 7: trains drive towards Wolfratshausen.
  • s 8: trains start in Pasing. Travel towards the airport begins in Johanneskirchen, also with replacement traffic to Ostbahnhof.
  • s 20: All trains are completely.

punctuality under observation

The punctuality of Deutsche Bahn remains a much discussed topic. In 2023, 64% of long -distance trains were on time, which is a slight decline compared to the previous year. DB Regio trains, on the other hand, were able to achieve pleasant 92-93% punctuality in the first quarter of the year. [Zeit.de reports that…] (https://www.zeit.de/mobilitaet/2024-08/deutschebahn-bahn-uenktinheit-juli

construction sites, renovations and other disorders often affect the timetable, as is clear in the current renovation work. Deutsche Bahn plans to improve its construction site management in the future in order to better regulate traffic flows and minimize delays.

The travelers can easily find out online about current information on timetable deviations and construction sites in order to avoid potentiated problems during their trip in good time. It is to be hoped that the upcoming work will eventually ensure better infrastructure and more reliable rail traffic.

Details
OrtJohanneskirchen, Deutschland
Quellen