Traffic chaos in Munich: A99 between Allach and tunnel blocked!

Traffic chaos in Munich: A99 between Allach and tunnel blocked!
this day, July 14, 2025, a construction site on the A99 near Munich ensures considerable traffic disruptions. The work that extends between the Tunnel Allach and the Munich-Allach triangle towards Munich-Süd-West are expected to continue from 11:19 a.m. to 4:00 p.m. A construction site length of 54 meters can be expected to increase traffic loads, which may result in backgrounds and traffic jams. According to information from [news.de] (https://www.news.de/auto/858778000/verkehrspland-muenchen-zur-verkehrs-weg Hraenkung-AM-14-07-2025-beswirts-in-traffic venue-in-Muenchen-plz-8099-allach-undermen-allach-A99/1/) the information is provided by the Central Office of Transport Management Bavaria.
In the early morning hours, the traffic situation on the A99 was already tense. At 9:17 a.m., a traffic jam of 2.2 km between the Munich-Süd-West triangle and the Aubing tunnel was reported, with an average speed of only 5 km/h, which led to a loss of up to 25 minutes. Other reports reported up to 5 km of traffic jam between the Munich/Eschenried and the Tunnel Allach, where drivers had to calculate with a loss of up to 10 minutes. These traffic jams come from stau.info, a platform that regularly provides updates to the traffic situation on the motorways.
situation on the A99
In addition to the traffic jams already mentioned, other reports about various sections of the A99 were lifted, including between Kirchheim b. Munich and Aschheim/Ismaning as well as between the hair and cross Munich-Ost. These reports illustrate the dynamic traffic situation on this important traffic artery. In particular, the cancellation of the hazard reports awakens hope of normalizing traffic, but this is affected by the ongoing construction sites.
For drivers who are on the A99, it is worth taking a look at the interactive dashboard from [autobahn.de] (https://www.autobahn.de/betrieb-verkehr/aktuelle- traffic situation), which provides an overview of the current traffic situation and disorders. With the help of continuous monitoring, unpredictable disorders can quickly be recognized and the necessary measures can be initiated. This is done through coordinated action by the motorway traffic centers, which operate through a common operating system, which should enable the drivers to run smoothly.
Until the construction site work is completed on the A99, it is advisable to keep an eye on the traffic situation and, if necessary, to consider alternative routes in order to minimize time losses. Stay safe and patient on the streets!
Details | |
---|---|
Ort | Allach-Untermenzing, Deutschland |
Quellen |