Building in Munich: Gotthardstraße completely blocked by the end of June!

Verkehrseinschränkungen auf der Gotthardstraße in München: Bauarbeiten vom 16. bis 30. Juni 2025 verursachen Stau.
Traffic restrictions on Gotthardstrasse in Munich: Construction work from June 16 to 30, 2025 causes traffic jams. (Symbolbild/MM)

Building in Munich: Gotthardstraße completely blocked by the end of June!

The streets in Munich are known for being pulsating and full of life - but in the coming weeks, drivers have to make a lot of preparation. There are considerable traffic restrictions on Gotthardstrasse, which are currently reported by the Central Office for Transport Management Bavaria. This construction site, which began on June 16, 2025 and will continue until June 30, 2025, affects the section between Willibaldstraße and Mitterfeldstrasse. The construction work extends over a length of 340 meters and a detour via Mitterfeldstrasse was set up to support the flowing traffic. It is calculated with congestion, so it is advisable to choose alternative routes or walk where possible. This reports [news.de] (https://www.news.de/auto/858721489/ Verkehrsplandt-muenchen-zur-verkehrs-wegen-bauste-schraenkung-von-16-2025-bis-30 -06-2025-Raumen-in-traffic venue-Travel-PLZ-80689-Pasing-AM-AM-WESTBAD-St-Ulrich-on-der-Gotthardstrasse/1 /).

But that's not the only construction site that makes it difficult to transport Munich. While street work is in place on Gotthardstrasse, numerous construction sites are also active in other places in the city. At Englschalkinger Straße, for example, the municipal utilities carry out work on the power grid, which should last until August 29, 2025. There is no lane, but pedestrians and cyclists can pass the construction site. Some other important construction sites that are currently Mergent in the urban area include:

Current construction sites in Munich

  • Forstenrieder Allee: complete blocking until August 1st for district heating management, redirection.
  • Fürstenrieder Straße (Laim): single-lane navigation, restrictions for preparations for tram-West tangent.
  • Garmischer Straße: Construction work on the tram-Westtangente until August 2025, no restrictions on foot and bicycle traffic.
  • Geiselgasteigstraße: water network work until July 4, complete closure towards Grünwald.
  • Georg-Cumple-Ring: roadway renovation with bypasses since June 6th.

Munich remains well employed in the construction and transport sector, and many Munich residents will be happy to know that thanks to the new "Service Card construction sites" in the city, they can always be informed about current information. This platform, which was launched by various institutions such as the Munich Stadtwerke and the Munich Transport Society, indicates an overview of all construction sites and temporary traffic restrictions to inform the public in good time. In this way, those affected can plan more easily and minimize inconvenience while navigating through the city. For everyone who would like to find out about detailed information on specific construction sites and stopping bans, the online portal is a useful point of contact that offers majestic transparency about restrictions and their duration, such as muenchen.digital emphasized.

So if you are traveling in the city in the future, you should prepare for a certain patience and maybe plan one or the other detour. With all the construction projects, Munich becomes even more attractive in the long run, and you shouldn't lose sight of that!

Details
OrtGotthardstraße, 80689 München, Deutschland
Quellen